14:49, 01 April 2026

Etalon supplies profiled sheeting for the construction of a carpet factory in Dagestan

To construct the production building of a carpet factory in Kaspiisk, Производственное объединение Etalon (Production Association Etalon), a member of the Steel Construction Development Association, supplied the following products: profiled sheeting H114-750, galvanised, thickness 0.9 mm, in a volume of 19,500 linear metres, and profiled sheeting H75-750, galvanised, thickness 0.9 mm, in a volume of 1,330 linear metres.

Profiled sheeting H114 and H75 belong to the category of load-bearing profiles designed for use under high-load conditions. The corrugation height provides the necessary structural rigidity, which is particularly important for roofing and intermediate floor construction in industrial buildings. A steel thickness of 0.9 mm guarantees resistance to mechanical impact and dimensional stability during installation. The galvanised coating effectively protects the metal against corrosion and extends the service life of structural elements. The use of profiled sheeting H114-750 and H75-750 ensured high load-bearing capacity for the roof and floor structures of the production building. The material contributes to uniform load distribution, enhances the overall structural strength of the building, and meets modern industrial construction requirements. The precise profile geometry ensures ease and speed of installation, which has a positive impact on project delivery timelines.

Production Association Etalon completed the delivery in full and on schedule, confirming its reliability in the implementation of industrial construction projects. Steel Construction Development Association is a regular participant and organiser of business events at the International Industrial Exhibitions Metal-Expo'2026 and SteelStructures'2026.

New on the topic

Zinker: "Participation in SteelStructures'2026 Is an Opportunity to Be at the Heart of the Professional Agenda"

The exhibition complex SteelStructures'2026, Metallurgy/Litmash.Russia'2026, Steel Service Centres'2026 in Moscow will bring together appro...

21 May, 11:59

SteelStructures'2026: two weeks to go until the exhibition opens

The International Specialised Exhibition SteelStructures'2026 will take place in just two weeks, from May 26 to 28, 2026, at Timiryazev Centre in Moscow, located at Verkhnyaya Alleya 6, Building 1.

15 May, 14:54

Metal-Expo Directorate at Metal China'2026 in Shanghai

The Metal-Expo Directorate took part in the 24th China International Foundry Exhibition Metal China'2026 at the National Exhibition and Convention Centre in Shanghai. The event was organised by Metal-Expo's partner China Foundry Association, which this year celebrates its 40th anniversary.

14 May, 15:03

Zinker shares a case study on restoring protective coating on a dredger for sand and gravel extraction

Zinker has shared a case study on restoring protective coating on a dredger used for sand and gravel extraction in the town of Alexandrov. Experts note that not all metalwork takes place under "convenient" conditions.

05 May, 17:32
Subscription to newsletter